#81862: "Contracts"
Čeho se toto hlášení týká?
Co se stalo? Prosím vyberte níže
Detailní popis
-
• Která část pravidel nebyla dodržena adaptací hry na BGA
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). -
• Je vidět porušení pravidel na záznamu hry? Pokud ano, ve kterém tahu?
Move #359
I fulfilled a contract and the dam construction on it was taken automatically because there was only one available space and I had the 3 Credits needed for that space.
I should be able to choose not to construct that dam (I may want to fulfill the contract for it to count for a bonus tile, without being interested by a dam on that position). • Jaký prohlížeč používáte?
Google Chrome v109
Historie hlášení
The elevation granted by the contract was automatically build because there was only one place available.
Contract rewards are not mandatory.
The conduit granted by the contract was automatically built.
When there isn't only one place available, there is an option to skip building the structure. It should always be an option.
Doplňte tuto zprávu
- ID dalšího stolu / ID tahu
- Byla chyba odstraněna stisknutím F5?
- Objevila se tato chyba častěji? Pokaždé? Náhodně?
- Pokud máš snímek obrazvky zobrazující tuto chybu (doporučujeme!), můžeš použít Imgur.com pro nahrání obrázku a pak odkaz na tento obrázek na Imguru zkopírovat a vložit sem.